Accessibility Improvements
2018
8 Fenway
This project involved the following improvements:
- Construction of an exterior sloped walkway
- Reconfiguration of the main building entrance to provide an accessible path of travel
- Two accessible restrooms added on the ground floor
Multiple Locations
- Installation of code-compliant door handles, grab bars, and restroom fixtures
- Lighting and paint modifications, which reduce glare and increase the contrast between walls and doorframes, made for individuals with visual impairments
2016–2017
150 Massachusetts Avenue, Phase 2
This project involved the following improvements:
- The reconfiguration of the building’s main entrance, the creation of a substantially expanded lobby area, and the relocation of the dormitory elevator access to the upper floors of the building, to facilitate access for students with disabilities to the residence hall
- New accessible restrooms on levels A and B
2014
150 Massachusetts Avenue, Phase 1
This project involved the following improvements:
- The installation of an ADA-compliant elevator and establishment of an accessible path of travel, both of which led to improved access to levels B, A, 1, and 2
1108 Boylston Street
- Rehabilitated elevator, extended to the basement and sub-basement to provide access to practice rooms and student service space
2013
Berklee Performance Center
- Installation of automated door openers with push buttons on the exterior doors, affording improved access to the theater
161 Massachusetts Avenue
- Replacement of a step into this academic and office building with a sloped ramp
Multiple Locations
- Improvements to interior building signage throughout campus in compliance with applicable portions of Massachusetts state building code, enabling people with sight impairments to better identify individual rooms